Hello, this is IT Center Blog.
Company news from the first hand: everything that happened in IT Center yesterday, the day before yesterday and last Thursday. All publications are cleaned from white noise and synchronized with RSS feed.
Tags
All images © 2009–2023 www.svetlanalarina.com
Unauthorized use and/or duplication of text, photo and video material without express and written permission from IT Center Blog’s author and/or owner is strictly prohibited. Excerpts and links may be used, provided that full and clear credit is given to IT Center Blog with appropriate and specific direction to the original content.
Last week IT Center's engineers moved the EGAIS servers of one of their customers to the data center certified by Tier III.
Remember, we talked about the dynamic summer of 2017 and the most interesting project of the Moscow water intake node Belaya Dacha, in which IT Center took part? The same story through the eyes of the client:
‘Group 7’, Denis, thanks for the trust, we are also very pleased to work with you.
Unfortunately, this letter is just in Russian, but we are ready to translate it from Russian into English with great pleasure.
In 2016, the engineers of IT Center set up the workplace of the operator of EGAIS system in a new online format at the time. The work was carried out within the framework of the project of our Client, the main specialization of which is the sale of alcohol products.
There are servers within the structure of Rosalkogolregulirovaniya to account for the movement of alcohol products on the territory of Russia. These servers maintain the accountign database EGAIS. The operator of the Client connects to this system and enters there all the necessary information.
In 2016, to connect to the EGAIS, there was only one possibility — through the keys of Aladdin JaCarta. We will not discuss the functional of the system in this article, let's say just a few words about the key features.
The summer of 2017 was hot, dynamic and fruitful for IT Center, despite the endless +18 °C and rain.
Judge for yourself: we successfully closed two “cloud” and three web projects, a new client appeared in the IT Center cloud and we will write about it, the engineers of the company seriously modernized the IT Center Cloud infrastructure at the logical and hardware level, having purchased and having integrated the corresponding equipment, and the management held a record for themselves and others the number of negotiations: the assistants had difficulty in forming commercial offers for each separate meeting.